INSP-Final Inspection | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Tom Small Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test has been witnessed in areas where fire was located, no pressure loss observed.
Please call Tom with time frame. Because the system is existing we will pumping this up in small increments. We expect to be at 200 by 9 am. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping in area of work complete. Hydrostatic test to be completed at a later date.
Tom Phone #: ###-####
|
Intake Approval | | | 2/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/14/2019 | | 2/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/14/2019 | | 2/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/14/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/14/2019 | | DONE |
|
|
|
|
Application received | | | 2/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2019 2:45PM
|