INSP-Final Inspection | 7/9/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection complete.
Requesting inspection at 7AM. John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 6/26/2019 | 7/3/2019 | 7/3/2019 | A | CANC |
Jim Page
|
|
|
Inspection request will be rescheduled per conversation with point of contact, the 7AM inspection time was not cooodinated, need a minimum of a 24 hour notice with my approval as well as my supervisors approval for inspections outside of my normal working hours. Next inspection needs to be coordinated or it will result in a fail, this request is cancelled.
Requesting inspection at 7AM - John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
Plan assigned to (Lee) | 6/25/2019 | | 6/26/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/26/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/25/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/25/2019 | | DONE |
|
|
|
John Seward from Fire Sentry requested an as built workflow
|
INSP-Final Inspection | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | FAIL |
Jim Page
|
|
|
Audio visual device in basement next to print room is blocked by duct work. Sound requirements were no met for basement level restrooms. Adjust/add notification that is blocked on level 2, city approved drawings are notated for areas that require attention.
John Howard Technician, Phone #: ###-#### Inspection requested via web by John Siewert
|
Plan Modification Accepted | | | 6/6/2019 | | DONE |
|
|
|
as built
|
Plan assigned to (Lee) | 6/6/2019 | | 6/6/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/6/2019 | | 6/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/6/2019 | | DONE |
|
|
|
As built - No Fee
|
Permit Ready to Issue | | | 6/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/6/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/22/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 2/22/2019 | | 2/22/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/22/2019 | | DONE |
|
|
|
Resubmittal passed with reviews review comments.
|
Permit Ready to Issue | | | 2/22/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/22/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 2/15/2019 | | 2/15/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/15/2019 | | FAIL |
|
|
|
Visible notification is not adequate in several areas. See 1st review comments.
|
Application received | | | 2/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 14 2019 3:44PM
|