INSP-Final Inspection | 4/8/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Owners certificate provided for the Storage Room to remain light hazard and has been accepted by the Boise Fire.
Nathan Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Final Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the Storage Room 103 pendant heads addressed prior to a final sign off.
Adam Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PART |
Troy Cobbley
|
|
|
The heads shown to be added/relocated are approved for cover. However I noted that a room in the scope of work (but no actual work being performed) has heads overspaced. This is based on two sets of building plans laying on site which show this room as a Storage Room. The existing pendant heads in this room exceed 130 sq. ft. per head for Ordinary Hazard. Also another pendant head within the building scope of work is 9'-0" off a wall in a light hazard space that exceeds the 800 sq. ft. max.
RICK Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
Intake Approval | | | 3/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/4/2019 | | 3/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/4/2019 | | 3/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/19/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Waiting for issuance of bld permit.
|
Application received | | | 2/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2019 1:37PM
|