INSP-Final Inspection | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Payton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Atton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
No access, doors are locked. No inspection performed.
Payton Phone #: ###-####
|
Intake Approval | | | 2/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/19/2019 | | 2/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/19/2019 | | 2/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/19/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/19/2019 | | DONE |
|
|
|
|
Application received | | | 2/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2019 1:49PM
|