INSP-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Hydro test witnessed with no visible loss on the guage.
Gabe Phone #: ###-####
|
Sprinkler Plan Check | 5/24/2019 | | 5/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
plan mod - do not re issue
|
CHANGE STATUS TO (ISS) | | | 5/24/2019 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 5/16/2019 | | 5/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Troy Cobbley
|
|
|
Hydro test failed due to visible loss on the guage.
|
Plan Modification Accepted | | | 5/16/2019 | | DONE |
|
|
|
pipe that runs in the crawl space has changed from CPVC to Sch 40 Black Steel
|
INSP-Sprinkler Rough-in | 3/15/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Gabe and I spoke about cpvc riser requirements.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 2/21/2019 | | DONE |
|
|
|
|
Application received | | | 2/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 19 2019 8:00AM
|
Intake Approval | | | 2/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/19/2019 | | 2/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/19/2019 | | 2/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/19/2019 | | DONE |
|
|
|
met
|