INSP-Final Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
John Lopez Phone #: ###-####
|
Plan Modification Accepted | | | 6/11/2019 | | DONE |
|
|
|
as built accepted in e plan
|
Plan assigned to (Lee) | 6/11/2019 | | 6/11/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/11/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/11/2019 | | 6/11/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/11/2019 | | DONE |
|
|
|
As Built - No Fee
|
Permit Ready to Issue | | | 6/11/2019 | | DONE |
|
|
|
As Built Approved
|
CHANGE STATUS TO (ISS) | | | 6/11/2019 | | DONE |
|
|
|
as built no fees per lee
|
INSP-Final Inspection | 6/8/2019 | 6/10/2019 | 6/10/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need to test the flow switch, need to test the two duct smoke detectors, need as-builts.
Phone #: ###-#### Inspection requested via web by John Lopez
|
Issue and Print Permit | | | 3/27/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/26/2019 | | DONE |
|
|
|
|
1st review completed | | | 3/26/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/25/2019 | | 3/26/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/26/2019 | | DONE |
|
|
|
Quick permit passed. No review comments.
|
Miscellaneous action | | | 3/26/2019 | | DONE |
|
|
|
John Lopez confirmed that the AES is existing.
|
Permit Ready to Issue | | | 3/26/2019 | | DONE |
|
|
|
met
|
Plan assigned to (Lee) | 2/21/2019 | | 2/25/2019 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 2/25/2019 | | DONE |
|
|
|
Related building permit has not been issued. Returned to John until it is complete.
|
Application received | | | 2/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2019 11:25PM
|