INSP-Final Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Nick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Application received | | | 2/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2019 8:16AM
|
Intake Approval | | | 2/27/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/27/2019 | | 2/27/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/27/2019 | | 2/27/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/27/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/27/2019 | | DONE |
|
|
|
|