Permit Information
Permit NumberFIR19-00156
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 1123 N MILWAUKEE ST
Project NamePlanet Fitness
Customer Number 
ePlanReviewYes
Description
Tenant Improvement - Add or relocate heads to accommodate new walls and ceiling, reposition heads around new HVLS fans.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/3/20195/6/20195/6/2019APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in5/3/20195/6/20195/6/2019APASS
DetailsTroy Cobbley
Rough-in passed. Corrections made. Permit can be finaled when alarm interconnections are verified.
INSP-Final Inspection5/3/20195/3/20195/3/2019PCANC
DetailsTroy Cobbley
Contact Leroy Anderson ###-#### prior to Fire Final Insp start please... We would like to schedule this for 2 O''Clock PM if possible please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in5/2/20195/3/20195/3/2019AFAIL
DetailsTroy Cobbley
Not all work has been completed. Such as relocating uprights along the new walls and adding/relocating heads around the ceiling fans and in storage rooms. Missing canopies in the mens showers.

Leroy is the contact ###-#### Phone #: ###-#### Inspection requested via web by Scott Carter II
INSP-Sprinkler Rough-in4/29/20194/30/20194/30/2019ACANC
DetailsTroy Cobbley
Contact Tyler Loomis ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
Plan resubmittals received  4/25/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/25/2019 4/25/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/25/2019 4/25/2019 PASS
DetailsMark Stumbaugh
Fee $110.25
PLANS/APPL TAKEN TO FRONT DESK  4/25/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  4/25/2019 DONE
plan mod approved
Issue and Print Permit  4/25/2019 DONE
INSP-Sprinkler Rough-in/Hydro4/22/20194/23/20194/23/2019APASS
DetailsTroy Cobbley
The overhead hydro was witnessed with no pressure loss.

Contact Tyler Loomis ###-#### 30 min prior to Hydro Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Plan Modification Accepted  4/23/2019 DONE
plan mod per Terry
Plan assigned to (Stumbaugh)4/23/2019 4/23/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/23/2019 4/23/2019 FAIL
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/23/2019 DONE
DetailsMark Stumbaugh
INSP-Sprinkler Rough-in/Hydro4/22/20194/22/20194/22/2019PCANC
DetailsTroy Cobbley
The main drain valve failed. Contact Tyler Loomis ###-#### 30 min prior to insp start please, he would like to start at 2PM if at all possible.

Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/22/20194/22/20194/22/2019AFAIL
DetailsTroy Cobbley
Called contact phone number but could not leave message since acount not set up. Went to job site did not find fitter and system has not been pumped up yet. No inspection performed.


Contact Tyler Loomis ###-#### 30 min prior to Hydro insp start please


Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/19/20194/22/20194/19/2019PCANC
DetailsTroy Cobbley
Contact Tyler Loomis ###-#### 30 Min prior to Hydro Insp. start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in4/16/20194/19/20194/19/2019AFAIL
DetailsJim Page
Flex heads have been used throught the office area of TI, city approved drawings show heads being hard piped, a resubmittal will be required to verify that the calcs will support flex head install.

Contact Tyler Loomis ###-#### 30 min prior to RTC Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Intake Approval  3/1/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/1/2019 3/1/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/1/2019 3/1/2019 PASS
DetailsMark Stumbaugh
Approved as noted
PLANS/APPL TAKEN TO FRONT DESK  3/1/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  3/1/2019 DONE
met
Issue and Print Permit  3/1/2019 DONE
Application received  2/28/2019 DONE
Application submitted via PDS Online on Feb 28 2019 10:22AM