Telephone call | | | 5/14/2019 | | DONE |
|
|
|
talked to Stephanie on the phone-they request us to change the status of a permit for an as built but the permit has been finaled so called to let her know
|
INSP-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Mark Scharfen
|
|
|
Fire alarm testing on sprinkler monitor complete. Need as build for troubles on tamper as panel unable to do supervisory signal.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
Plan resubmittals received | | | 5/9/2019 | | |
|
|
|
Per Stephanie Cobbley, create as built work flow
|
Plan assigned to (Lee) | 5/9/2019 | | 5/9/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/9/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/9/2019 | | 5/9/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/9/2019 | | DONE |
|
|
|
No Fee - As built
|
Permit Ready to Issue | | | 5/9/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/9/2019 | | DONE |
|
|
|
AS BUILT NO FEES PER LEE
|
Plan assigned to (Lee) | 3/5/2019 | | 3/5/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/5/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/5/2019 | | 3/5/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/5/2019 | | DONE |
|
|
|
Plans passed with review comments.
|
Permit Ready to Issue | | | 3/5/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/5/2019 | | DONE |
|
|
|
|
Application received | | | 3/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2019 1:07PM
|