INSP-Final Inspection | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
AES doesn't annunciate locally for troulbe. May need to change radio out. Verified signals. Reports correctly. final when piezo installed which may require a different radio (per mike) and would require a resubmittal. Final when piezo is resolved.
Please call Mike at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Plan assigned to (Lee) | 3/5/2019 | | 3/5/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/5/2019 | | FAIL |
|
|
|
Failed pre-screen review. Needs drawing, product data and chechlist.
|
Alarm Plan Check | 3/5/2019 | | 3/5/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/5/2019 | | DONE |
|
|
|
Plans passed. No comments.
|
Permit Ready to Issue | | | 3/5/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/5/2019 | | DONE |
|
|
|
|
Application received | | | 3/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2019 4:46PM
|