Permit Information
Permit NumberFIR19-00168
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 333 N 1ST ST
Project NameSLMOP BOISE SURGERY CENTER
Customer Number 
ePlanReviewYes
Description
INSTALL NEW PENDENT AND UPRIGHT SPRINKLER HEADS TO THE NEW WALL AND CEILING LAYOUT ON THE FIRST FLOOR. EXTEND THE EXISTING DRY SYSTEM UNDER THE NEW MECHANICAL PLATFORM ON THE ROOF.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/22/201910/23/201910/23/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

contact Lonnie to cordinate final inpsection Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in10/15/201910/15/201910/15/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlid and suspeneded ceiling, west coridor complete, area inspected approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/22/20198/23/20198/23/2019APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/19/20198/20/20198/20/2019PPART
DetailsJim Page
Rough in inspection for dry system addition on top level of parking structure complete.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/8/20198/9/20198/9/2019APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, notated the city approved drawings with red ink areas approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in7/26/20197/26/20197/26/2019APART
DetailsJim Page
Partial rough to cover inspectionfor overhead fire sprinkler piping in area of work complete, notated the city approved drawings with red ink areas approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in6/11/20196/12/20196/12/2019APART
DetailsJim Page
Rough to cover inspection for sprinkler piping above hardlids in locker rooms complete, approved for cover.

Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
Issue and Print Permit  3/13/2019 DONE
Plan resubmittals received  3/12/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/12/2019 3/12/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/12/2019 3/12/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/12/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  3/12/2019 DONE
met
Sprinkler Plan Check3/5/2019 3/8/2019 FAIL
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/8/2019 DONE
DetailsMark Stumbaugh
Application received  3/5/2019 DONE
Application submitted via PDS Online on Mar 5 2019 12:10PM
Intake Approval  3/5/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)3/5/2019 3/5/2019 DONE
DetailsMark Stumbaugh