INSP-Final Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Cole Phone #: ###-####
|
Application received | | | 3/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2019 9:24AM
|
Intake Approval | | | 3/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/8/2019 | | 3/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/8/2019 | | 3/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/8/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/8/2019 | | DONE |
|
|
|
|