INSP-Final Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Jim Page
|
|
|
As-builts match install, final fire alarm inspection complete.
This was already finaled by Jim Page, just needed the plan mod to be approved. This was approved and should be signed off on without a second walk through. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
per Lee M-no fees for plan mod
|
CHANGE STATUS TO (ISS) | | | 6/20/2019 | | DONE |
|
|
|
as per Lee M-no fees for the plan mod/as built
|
INSP-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PART |
Jim Page
|
|
|
Fina fire alarm inspection for scope of work complete, awaiting plan mod approval for final sign off.
(plan mod in process)
Ron ###-####
|
Alarm Plan Check | 5/21/2019 | | 5/21/2019 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks/plan mod fee to be added, room use has changed and elevator alams devices were added originally not inculded in scope of work.
|
Plan resubmittals received | | | 5/16/2019 | | DONE |
|
|
|
per Kristen start workflow to upload as built
|
Issue and Print Permit | | | 4/26/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/18/2019 | | 4/24/2019 | | DONE |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 4/24/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 4/24/2019 | | 4/24/2019 | | PART |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/24/2019 | | DONE |
|
|
|
Passed with comments.
|
Override - Parcel Holds | | | 4/24/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 4/24/2019 | | DONE |
|
|
|
Plan Mod approved- DO NOT RE ISSUE
|
1st review completed | | | 4/19/2019 | | DONE |
|
|
|
Drawings submitted with incorrect file names. New file names were different than originals. New drawings were deleted and the application was returned for corrections. Applicant notified.
|
Plan Modification Accepted | | | 4/18/2019 | | DONE |
|
|
|
Kristen asked to have the permit open for a plan modification. Started Eplan work flow
|
Application received | | | 3/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2019 9:27AM
|
Plan assigned to (Lee) | 3/12/2019 | | 3/12/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/12/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/12/2019 | | 3/12/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/12/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/12/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 5/16/2019 | | | | |
Lee G Meredith
|
|
|
As built
|