INSP-Final Inspection | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Mark Scharfen
|
|
|
Conducted fire alarm inspection. Verified device functionality and signals. Passed.
Mike Phone #: ###-####
|
INSP-Final Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | FAIL |
Mark Scharfen
|
|
|
Checked strobe placement and settings. When testing fire alarm the speaker circuit did not activate. Mike with State was going to verify programming and reschedule.
Call prior to going Phone #: 2089853303 >> Inspection requested via mobile web by Mike Kroll
|
Permit Ready to Issue | | | 4/30/2019 | | DONE |
|
|
|
as built drawings- no fee per Lee
|
CHANGE STATUS TO (ISS) | | | 4/30/2019 | | DONE |
|
|
|
|
1st review completed | | | 4/30/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/30/2019 | | 4/30/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/30/2019 | | DONE |
|
|
|
As built drawings passed.
|
Plan assigned to (Lee) | 4/29/2019 | | 4/30/2019 | | DONE |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 4/29/2019 | | DONE |
|
|
|
Stephanie asked for the work flow to be reopend for as built drawings
|
Alarm Plan Check | 3/15/2019 | | 3/15/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/15/2019 | | DONE |
|
|
|
Pans passed with review comments.
|
Permit Ready to Issue | | | 3/15/2019 | | DONE |
|
|
|
all requirements met
|
Issue and Print Permit | | | 3/15/2019 | | DONE |
|
|
|
|
Application received | | | 3/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2019 12:48AM
|
Plan assigned to (Lee) | 3/14/2019 | | 3/14/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/14/2019 | | FAIL |
|
|
|
Failed prescreen. Product data too pixilated to read and calcs. too light, making them hard to read.
|