INSP-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Johnathon Phone #: ###-####
|
INSP-Final Inspection | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final but the rough-in passed and piping can be covered. Janason Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/3/2019 | 4/4/2019 | 4/4/2019 | P | CANC |
Troy Cobbley
|
|
|
Jonathan Phone #: ###-####
|
Issue and Print Permit | | | 4/3/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/26/2019 | | 3/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/26/2019 | | 3/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/19/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD19-00267 to be issued
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 3/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 18 2019 2:04PM
|