INSP-Final Inspection | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Mark Scharfen
|
|
|
Tested heat tape. Functions. Passed
|
INSP-Final Inspection | 5/1/2019 | 5/2/2019 | 5/2/2019 | P | NH |
Mark Scharfen
|
|
|
Entered Record by mistake. Inspection scheduled for 1:30PM Passed
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
CHANGE STATUS TO (ISS) | | | 5/2/2019 | | DONE |
|
|
|
should not have been closed per mark s
|
Plan Modification Accepted | | | 4/23/2019 | | DONE |
|
|
|
as build per Dante
|
Plan assigned to (Lee) | 4/23/2019 | | 4/23/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/23/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/23/2019 | | 4/23/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/23/2019 | | DONE |
|
|
|
As builts passed.
|
Permit Ready to Issue | | | 4/23/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/23/2019 | | DONE |
|
|
|
no fee. as built per Lee
|
Application received | | | 3/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2019 11:49AM
|
Plan assigned to (Lee) | 3/19/2019 | | 3/19/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/19/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/19/2019 | | 3/19/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/19/2019 | | DONE |
|
|
|
Passed with comments.
|
Permit Ready to Issue | | | 3/19/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/19/2019 | | DONE |
|
|
|
|