INSP-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Eric Phone #: ###-####
|
INSP-Final Inspection | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | FAIL |
Troy Cobbley
|
|
|
Two fo the three flow switches did not function. Still need to test the crawl space tamper switches.
We would like 9:30am if that is possible. Phone #: ###-#### Inspection requested via web by Fire Scheduler
|
Plan Modification Accepted | | | 4/16/2019 | | DONE |
|
|
|
Requested by Mary from Crane Alarm Service
|
Plan assigned to (Lee) | 4/16/2019 | | 4/16/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/16/2019 | | FAIL |
|
|
|
Upper floors did not get revised drawings uploaded. Returned for corrections.
|
Plan resubmittals received | | | 4/16/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 4/16/2019 | | 4/16/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/16/2019 | | DONE |
|
|
|
Plan mod passed with updated comments.
|
Permit Ready to Issue | | | 4/16/2019 | | DONE |
|
|
|
PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 4/16/2019 | | DONE |
|
|
|
plan mod
|
Issue and Print Permit | | | 3/21/2019 | | DONE |
|
|
|
|
Application received | | | 3/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2019 9:37AM
|
Plan assigned to (Lee) | 3/20/2019 | | 3/20/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/20/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/20/2019 | | 3/20/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/20/2019 | | DONE |
|
|
|
Review passed with comments.
|
Permit Ready to Issue | | | 3/20/2019 | | DONE |
|
|
|
|