INSP-Final Inspection | 7/10/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Jim Page
|
|
|
Remaining rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Patten Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in area of work complete, notated city approved drawings areas approved for cover.
John Phone #: ###-####
|
Intake Approval | | | 3/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/25/2019 | | 3/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/25/2019 | | 3/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/25/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 3/25/2019 | | DONE |
|
|
|
|
Application received | | | 3/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 22 2019 3:06PM
|