Fees Due Hold | 5/9/2019 | | 5/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/13/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 5/13/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
josiah Phone #: ###-####
|
INSP-Final Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | FAIL |
Troy Cobbley
|
|
|
See correction notes from alarm testing entry. Josiha Phone #: ###-####
|
INSP-Alarm Testing | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | FAIL |
Troy Cobbley
|
|
|
One device did not have the cover secured, another was not set at the correct candella and horn/strobes have been installed instead of strobes. This was on the third floor. The inspection was stopped. Need plan modifications or the installation needs to match the city approved plans. Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
Fees Due Hold | 5/8/2019 | | 5/8/2019 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 5/8/2019 | | DONE |
|
|
|
per Dante Frassa start workflow "as Built"
|
Plan assigned to (Lee) | 5/8/2019 | | 5/8/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/8/2019 | | 5/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/8/2019 | | DONE |
|
|
|
Passed
|
CHANGE STATUS TO (ISS) | | | 5/8/2019 | | DONE |
|
|
|
|
Fees Due Hold | 5/4/2019 | | 5/7/2019 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 4/3/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 3/29/2019 | | 4/1/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/1/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/1/2019 | | 4/1/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/1/2019 | | DONE |
|
|
|
Passed with comments.
|
Permit Ready to Issue | | | 4/1/2019 | | |
|
|
|
Met
|
Application received | | | 3/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2019 2:59PM
|