INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for demo scope of work complete.
Rand Phone #: ###-####
|
INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Rand Phone #: ###-####
|
Permit Ready to Issue | | | 4/12/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 4/12/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/11/2019 | | 4/11/2019 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 4/11/2019 | | DONE |
|
|
|
Emailed Rand for more information. Scope does not indicate if the is an identical 1 for 1 replacement or if it is a new / different panel, which would require an upgrade if system doesn't meet current code.
Rand responded to clarify that this is a removal only of a non-functional, non-required system.
|
1st review completed | | | 4/11/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/11/2019 | | 4/11/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/11/2019 | | DONE |
|
|
|
Quick permit approved. No comments.
|
Application received | | | 4/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2019 9:14AM
|