INSP-Final Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Troy Cobbley
|
|
|
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Sprinkler Plan Check | 4/8/2019 | | 4/9/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/9/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 4/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/8/2019 | | 4/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 4/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 5 2019 8:13AM
|