INSP-Final Inspection | 5/20/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete., record of completion was a digital form, document will be emailed to Lee Meridith per conversation with on-site technician.
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2019 | 5/22/2019 | 5/20/2019 | A | CANC |
Jim Page
|
|
|
Phone #: 2088990672 >> Inspection requested via mobile web by Josiah Inspection cancelled via mobile web on Monday, May 20, 2019.
|
Plan Modification Accepted | | | 5/14/2019 | | DONE |
|
|
|
relocating a strobe and adding a new
|
Plan assigned to (Lee) | 5/14/2019 | | 5/14/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/14/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/14/2019 | | 5/14/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/14/2019 | | DONE |
|
|
|
Passed. No additional comments.
|
Permit Ready to Issue | | | 5/14/2019 | | DONE |
|
|
|
met
|
CHANGE STATUS TO (ISS) | | | 5/14/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/14/2019 | | DONE |
|
|
|
|
Application received | | | 4/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2019 10:28AM
|
Plan assigned to (Lee) | 4/8/2019 | | 4/8/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/8/2019 | | 4/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/8/2019 | | DONE |
|
|
|
Quick permit passed. No comments.
|
Permit Ready to Issue | | | 4/8/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 4/8/2019 | | DONE |
|
|
|
|