INSP-Final Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Adam Phone #: ###-####
|
Issue and Print Permit | | | 4/10/2019 | | DONE |
|
|
|
|
Application received | | | 4/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2019 2:20PM
|
Intake Approval | | | 4/9/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/9/2019 | | 4/9/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/9/2019 | | 4/9/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/9/2019 | | DONE |
|
|
|