INSP-Final Inspection | 10/22/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
Backflow test is scheduled to be complete by noon. Please call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Jim Page
|
|
|
Provide annual inspection for backflow. Irrigation shutdown on flow switch activation not hooked up coorectly at time of inspection, no flow test completed.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Correctionhas been made, approved for cover.
Call James for more info. Tenting re-inspection at entry due to proximity of pipe to exterior deck above. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at 200PSI, above the static city pressure requirement, no pressure loss observed.
Overhead rough/hydro and tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 6/12/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/6/2019 | | 6/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/6/2019 | | 6/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/6/2019 | | DONE |
|
|
|
met
|
Application received | | | 4/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 10 2019 1:04PM
|
Intake Approval | | | 4/10/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting building permit to be issued.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|