INSP-Final Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Screened- Ron Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test has been witnessed at city pressure, no pressure loss observed at riser provided gauge.
|
INSP-Sprinkler Rough-in/Hydro | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jim Page
|
|
|
Freeze protection has been corrected by adding a pass through vent, all piping has been approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | DONE |
Jim Page
|
|
|
Main line flush is complete, plans need to be submitted to reflect the addition of a dedicated fire line, water delivery is no longer a domestic shared system.
under ground flush // Ron Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PART |
Jim Page
|
|
|
Most of the previously noteditems have been corrected, all arras except for the main entry approved for cover, main entry has CPVC encapsulated with foam spray in insulation, gap needs to be clear between pipe and sheetrock for freeze protection. Insulators need to provide documentation showing that the spray in foam is compatible with contacting CPVC pipe. Main entry is not approved for cover.
Ron Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | FAIL |
Jim Page
|
|
|
Tenting needs to be corrected in numerous areas.
Ron-insulation Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping located between conditioned spaces approved for cover, piping in attic spaces that requires tenting is not approved for cover until tenting is installed, inspected and accepted.
Ron Larson - Rough-in for residential system Phone #: ###-####
|
Issue and Print Permit | | | 5/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/30/2019 | | DONE |
|
|
|
met
|
Sprinkler Plan Check | 4/30/2019 | | 4/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 4/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/24/2019 | | 4/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/24/2019 | | 4/24/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 4/22/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 4/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 12 2019 11:30AM
|