INSP-Final Inspection | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/23/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
|
CHANGE STATUS TO (ISS) | | | 8/7/2019 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 5/20/2019 | | DONE |
|
|
|
Changes to the entrance of the building
|
Plan assigned to (Stumbaugh) | 5/20/2019 | | 5/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/20/2019 | | 5/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 5/20/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/22/2019 | | DONE |
|
|
|
|
Application received | | | 4/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 19 2019 10:35AM
|
Intake Approval | | | 4/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/19/2019 | | 4/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/19/2019 | | 4/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/19/2019 | | DONE |
|
|
|
|