INSP-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/4/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Call for access- Steve Phone #: ###-####
|
Intake Approval | | | 4/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/30/2019 | | 4/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/30/2019 | | 4/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 4/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/30/2019 | | 4/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/30/2019 | | 4/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/30/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 4/30/2019 | | DONE |
|
|
|
|
Application received | | | 4/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2019 2:49PM
|