INSP-Final Inspection | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Adam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, approved for cover.
Adam Phone #: ###-####
|
Issue and Print Permit | | | 4/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/25/2019 | | 4/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/25/2019 | | 4/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/25/2019 | | DONE |
|
|
|
met
|
Application received | | | 4/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2019 4:24PM
|