INSP-Final Inspection | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Ken Webster
|
Plan Modification Accepted | | | 5/6/2019 | | DONE |
|
|
|
as built submitted in e plan
|
Plan assigned to (Lee) | 5/6/2019 | | 5/6/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 5/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/6/2019 | | 5/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/6/2019 | | DONE |
|
|
|
As built passed.
|
Permit Ready to Issue | | | 5/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/6/2019 | | DONE |
|
|
|
as per Lee M no fee for the as built
|
Issue and Print Permit | | | 4/30/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/24/2019 | | 4/25/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/25/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 4/25/2019 | | 4/25/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/25/2019 | | DONE |
|
|
|
Passed with comments.
|
Permit Ready to Issue | | | 4/25/2019 | | DONE |
|
|
|
|
Application received | | | 4/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2019 7:21PM
|