INSP-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.Janason Phone #: ###-####
|
Issue and Print Permit | | | 5/10/2019 | | DONE |
|
|
|
|
Application received | | | 4/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2019 9:30AM
|
Intake Approval | | | 4/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 4/29/2019 | | 4/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 4/29/2019 | | 4/29/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 4/29/2019 | | DONE |
|
|
|
|