INSP-Final Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground Finaled.
Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Supply line flush | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Schedule with Troy for time to meet with Suez. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping hydro test was witnessed with no pressure loss.
Please call Troy with time frame. UG Hydro Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground Rough-in passed. Piping can be covered. Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
Intake Approval | | | 5/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/10/2019 | | 5/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/10/2019 | | 5/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/10/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/10/2019 | | DONE |
|
|
|
|
Application received | | | 4/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 30 2019 10:41AM
|
Intake Approval | | | 4/30/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit to be issued
|