INSP-Final Inspection | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
INSP-Final Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct tamper switch, provide the smoke detector with-in 5' of the panel on the wall as discussed, clear the trouble signal on the FACP as discussed, provide knox key box, provide testing of devices. Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
Plan assigned to (Lee) | 5/7/2019 | | 5/8/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 5/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/8/2019 | | 5/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/8/2019 | | DONE |
|
|
|
as per Lee M-no fees due for the as built
|
(F) Reprint permit | | | 5/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/7/2019 | | DONE |
|
|
|
Per Mary at ECI start an as built workflow
|
Plan assigned to (Lee) | 5/3/2019 | | 5/3/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/3/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/3/2019 | | 5/3/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/3/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 5/3/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 5/3/2019 | | DONE |
|
|
|
|
Application received | | | 5/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2019 4:11PM
|