INSP-Final Inspection | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Bret Phone #: ###-####
|
Staff review | 5/22/2019 | 5/22/2019 | 5/22/2019 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
as builds accepted-no plan mod fee
|
CHANGE STATUS TO (ISS) | | | 5/22/2019 | | DONE |
|
|
|
as builts approved, no fees due
|
Plan resubmittals received | | | 5/15/2019 | | DONE |
|
|
|
John from Fire Sentry Systems asked for the workflow to be opened for as built drawings.
|
INSP-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | FAIL |
Troy Cobbley
|
|
|
There are still issues with strobe coverage. No testing performed. Chris Siewert, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Chris Siewert, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
Issue and Print Permit | | | 5/7/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 5/6/2019 | | 5/6/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 5/6/2019 | | 5/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/6/2019 | | DONE |
|
|
|
Quick permit passed. No comments.
|
Permit Ready to Issue | | | 5/6/2019 | | DONE |
|
|
|
met
|
Application received | | | 5/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 3 2019 2:28PM
|
Plan assigned to (Lee) | 5/15/2019 | | | | |
Lee G Meredith
|
|
|
|