INSP-Final Inspection | 6/28/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Adam Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Adam Phone #: ###-####
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2019 7:29AM
|
Intake Approval | | | 5/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/10/2019 | | 5/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/10/2019 | | 5/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/10/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/10/2019 | | DONE |
|
|
|
|