INSP-Final Inspection | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Mick Woodburn
|
Plan Modification Accepted | | | 5/30/2019 | | DONE |
|
|
|
plan mod to add 3 uprights to bring up to code per Matt from Delta
|
Plan assigned to (Stumbaugh) | 5/30/2019 | | 5/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/30/2019 | | 5/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/30/2019 | | DONE |
|
|
|
no plan mod fee
|
Permit Ready to Issue | | | 5/30/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/30/2019 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PART |
Troy Cobbley
|
|
|
Sprinkler rough-in for the restrooms passed. I noted sprinklers overspaced in the rear exit path that will need addressed through a plan modification or a separate permit.
Contact Jason Gilster at ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
|
Intake Approval | | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/14/2019 | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/14/2019 | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/14/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 5/14/2019 | | DONE |
|
|
|
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2019 9:14AM
|