INSP-Final Inspection | 10/1/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler ispection for area of work complete.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping in area of work complete, approved for cover.
Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, corridors are the last remaining items to inspect, all other areas approved for cover to include restroom hardlids.
Randy Phone #: ###-####
|
Intake Approval | | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/14/2019 | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/14/2019 | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/14/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 5/14/2019 | | DONE |
|
|
|
|
Application received | | | 5/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2019 10:57AM
|