INSP-Final Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Adam Phone #: ###-####
|
Issue and Print Permit | | | 5/16/2019 | | DONE |
|
|
|
|
Application received | | | 5/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2019 3:04PM
|
Intake Approval | | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/14/2019 | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/14/2019 | | 5/14/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/14/2019 | | DONE |
|
|
|
|