Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR19-00355
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION
Site Address 1075 N CURTIS RD
Project NameSARMC Hartman Vascular TI
Customer Number 
ePlanReviewYes
Description
SARMC Hartman Vascular TI - This is an addition of a NAC panel next to the existing Simplex 4002 in the electrical room 1st floor.
This will involve a demo of a couple of AV devices, then a remodel of an existing doctors Suite on 1st
floor. We will run all new AV devices off of new NAC panel. This work is associated with BLD19-00771.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/7/201911/7/201911/7/2019PPASS
DetailsTroy Cobbley
Permit finaled.

Phone #: ###-#### Inspection requested via web by Kristin Dolan
Plan assigned to (Lee)11/5/2019 11/6/2019 DONE
DetailsLee G Meredith
as built
1st review completed  11/6/2019 DONE
Alarm Plan Check11/6/2019 11/6/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  11/6/2019 DONE
As built - No fee.
Permit Ready to Issue  11/6/2019 DONE
CHANGE STATUS TO (ISS)  11/6/2019 DONE
Plan resubmittals received  11/5/2019 DONE
Kristin from Johnson Controld requested a plan mod workflow for as built
INSP-Final Inspection10/21/201910/22/201910/22/2019APART
DetailsTroy Cobbley
A temp for fire alarm with boise fire approval until a notification device is added in the Reading Room. These are engineered plans and will need their approval prior to submittal to the city.

possibly 7am // Brandon Phone #: ###-####
Plan assigned to (Lee)10/18/2019 10/21/2019 DONE
DetailsLee G Meredith
as built upload
1st review completed  10/21/2019 PASS
Alarm Plan Check10/21/2019 10/21/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  10/21/2019 DONE
As built - No fee.
Permit Ready to Issue  10/21/2019 DONE
as built. no fees per lee
CHANGE STATUS TO (ISS)  10/21/2019 DONE
as built. no fees per lee
Plan Modification Accepted  10/18/2019 DONE
request for as built by Kristen
CHANGE STATUS TO (ISS)  9/19/2019 DONE
Canceled As Builts
Plan resubmittals received  8/23/2019 DONE
as built - canceled
CHANGE STATUS TO (ISS)  7/24/2019 DONE
1st review completed  7/23/2019 PASS
Alarm Plan Check7/23/2019 7/23/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  7/23/2019 DONE
Plan mod passed - no additional comments.
Permit Ready to Issue  7/23/2019 DONE
plan mod
Plan Modification Accepted  7/22/2019 DONE
plan mod requested by Kristen
Plan assigned to (Lee)7/22/2019 7/22/2019 DONE
DetailsLee G Meredith
plan mod
Issue and Print Permit  6/12/2019 DONE
(F) Reprint permit  6/12/2019 DONE
Plan resubmittals received  6/7/2019 DONE
Plan assigned to (Lee)6/7/2019 6/7/2019 DONE
DetailsLee G Meredith
1st review completed  6/7/2019 PASS
Alarm Plan Check6/7/2019 6/7/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  6/7/2019 DONE
Passed with comments.
Permit Ready to Issue  6/7/2019 DONE
Met
Intake Approval  5/22/2019 FAIL
DetailsMark Stumbaugh
Application received  5/20/2019 DONE
Application submitted via PDS Online on May 20 2019 5:34PM