INSP-Final Inspection | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Mike O Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for newly installed piping witnessed, no pressure loss observed.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | DONE |
Jim Page
|
|
|
24 hour air test has been witnessed, no pressure loss observed.
24 hour air test. Mike Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping in area of work complete.
Mike Phone #: ###-####
|
Plan assigned to (Stumbaugh) | 7/11/2019 | | 7/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 7/12/2019 | | 7/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 7/12/2019 | | DONE |
|
|
|
plan mod-please do not re issue
|
CHANGE STATUS TO (ISS) | | | 7/12/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/11/2019 | | DONE |
|
|
|
plan mod-assigned to MAS
|
INSP-Sprinkler Rough-in | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PART |
Jim Page
|
|
|
Inspection for pre-set hangers complete.
Hanger Attachments Rick Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
Issue and Print Permit | | | 5/29/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/24/2019 | | 5/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/24/2019 | | 5/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
met
|
Application received | | | 5/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 22 2019 10:42AM
|
Intake Approval | | | 5/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 5/22/2019 | | 5/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/22/2019 | | 5/22/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|