INSP-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | CANC |
Jim Page
|
|
|
Inspection request is cancelled, addressing needs to be corrected by the GC for the BLD permit assigned to this space, cannot final permit until addressing is corrected and project related permits have the correct address for tenant space, 509 McGregor is already used by COI in the same building and no suite number has been assigned to this tenant space.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. Demising wall did not go all of the way to the deck, no extra upright fire sprinklers are required as shown on the city approved drawings.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Intake Approval | | | 6/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/10/2019 | | 6/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/10/2019 | | 6/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/10/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 6/10/2019 | | DONE |
|
|
|
|
Application received | | | 5/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 22 2019 4:09PM
|