DOC - Permit Finaled | | | 10/14/2019 | | DONE |
|
|
|
Received an emailed picture of the breaker lock installed.
|
INSP-Final Inspection | 10/8/2019 | 10/11/2019 | 10/11/2019 | P | FAIL |
Troy Cobbley
|
|
|
Needs breaker lock for final per Lee.
Please call Nate at ###-#### Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Plan resubmittals received | | | 10/8/2019 | | DONE |
|
|
|
start as built workflow per Lori at Alarmco
|
Plan assigned to (Lee) | 10/8/2019 | | 10/8/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 10/8/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/8/2019 | | 10/8/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/8/2019 | | DONE |
|
|
|
As built - No Fee.
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
As built approved
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/27/2019 | 10/3/2019 | 10/2/2019 | A | CANC |
Troy Cobbley
|
|
|
Please call Nate at ###-#### Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|
Plan resubmittals received | | | 9/6/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/6/2019 | | 9/6/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/6/2019 | | 9/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/6/2019 | | DONE |
|
|
|
As built - no fee.
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/6/2019 | | DONE |
|
|
|
as built- no fee per Lee
|
Plan assigned to (Lee) | 9/4/2019 | | 9/5/2019 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 9/5/2019 | | 9/5/2019 | | FAIL |
Lee G Meredith
|
|
|
Outside horn installed at sprinkler room is not allowed. Needs to be removed or programmed not to activate on waterflow. Emailed Lori.
|
Plan resubmittals received | | | 9/4/2019 | | DONE |
|
|
|
Laure asked the work flow to be re opened for as built
|
Plan assigned to (Lee) | 6/3/2019 | | 6/3/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/3/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/3/2019 | | 6/3/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/3/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 6/3/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/3/2019 | | DONE |
|
|
|
|
Application received | | | 5/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2019 11:12AM
|