INSP-Final Inspection | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been accepted, final fire sprinkler inspection complete for area of work.
This final has already been done, this is just the paper trail. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Sprinkler Plan Check | 8/7/2019 | | 8/13/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/13/2019 | | DONE |
|
|
|
plan mod // permit was mistakenly re-issued on this date, original issue date is 6/10/19
|
INSP-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | DONE |
Troy Cobbley
|
|
|
Plans are in review status but I did note that several of the corridor sidewall heads appear to be blocked by adjacent walls and lockers.
George Jess is the contact. He would like this to take place before the hydro. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro for the wet system was witnessed with no pressure loss. No rough-in inspection performed due to plans being in review status. George Jess is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan assigned to (Stumbaugh) | 8/6/2019 | | 8/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/7/2019 | | 8/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 8/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/7/2019 | | 8/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan Modification Accepted | | | 8/6/2019 | | DONE |
|
|
|
Per Kyle Kallmeyer
-some walls have been added by the GC and we had to add pipe and heads
-some of the unistrut, acting as hangers and eq bracing, woiuld not hold in the cmu, so we had lateral braces (in places)
-a few minor pipe route changed - includes a few extra fittings
|
INSP-Supply line flush | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | DONE |
Jim Page
|
|
|
Underground main line flush complete.
George Jess is the contact for this Underground Hydro and Flush. Stacey @ Suez said he would be able to help us at 1PM. We appreciate your help with this. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for undergound supply witnessed, no pressure loss observed.
George Jess is the contact for this Underground Hydro and Flush. Stacey @ Suez said he would be able to help us at 1PM. We appreciate your help with this. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground supply rough-in passed. Piping is ok for cover.
Bryan Collins is the contact. He would like this inspection as soon as possible today. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan resubmittals received | | | 6/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/10/2019 | | 6/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/10/2019 | | 6/10/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/10/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 6/10/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/7/2019 | | 6/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/7/2019 | | 6/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 6/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 6/5/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit to be issued.
|
Application received | | | 6/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2019 8:10AM
|