INSP-Final Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | A | CANC |
Jim Page
|
|
|
|
INSP-Final Inspection | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Tom Phone #: ###-####
|
Intake Approval | | | 6/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/19/2019 | | 6/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/19/2019 | | 6/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/19/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/19/2019 | | DONE |
|
|
|
|
Application received | | | 6/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 5 2019 7:58AM
|