Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR19-00426
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 110 N 27TH ST
Project NameGravity Payments TI
Customer Number 
ePlanReviewYes
Description
Tenant improvement of 10,692 Sq Ft 2 level Bldg, Occupancy Class B Construction Type V B, Existing main level is not in scope of work for Phoenix fire, tie existing branch line into New Dead Main at Basement level
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/24/20198/26/20198/26/2019PPASS
DetailsTroy Cobbley
Permit finaled

Contact Andrew Larson ###-#### 30 Min prior to Final Insp start please, He request that this be later in the pm so Back Cert can be certified by Pacific Back Flow.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection8/22/20198/23/20198/23/2019PFAIL
DetailsJim Page
Replace 2 heads that were painted. Head next to southeast exit is blocked by communication wires. Remove masking on sprinkler head.

Contact Andrew Larson - ###-#### 30 Min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in8/16/20198/16/20198/16/2019PPASS
DetailsJim Page
Previously noted items for rough in have been corrected, cover is approved.

INSP-Sprinkler Rough-in/Hydro8/15/20198/16/20198/16/2019PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Contact Kieth Orahood 208-629--9953 30 min Prior to Hydro Insp start please. He''s requesting an Early PM insp if at all possible.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Fees Due Hold8/9/2019 8/15/2019 DONE
Details
INSP-Sprinkler Rough-in8/7/20198/8/20198/8/2019AFAIL
DetailsJim Page
Upright heads in meeting room C are still overspaced. No corrections were made to Quiet Room sidewalls or mech room blocked heads. Added head under stairs needs a hanger, almost 3 foot of unsupported pipe.

Contact Keith Orahood ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro8/2/20198/5/20198/5/2019PFAIL
DetailsJim Page
Upright head in Meeting Room C is overspaced, needs corrected. Correct head blockage in mechanical room, mech room has a duct over 48 inches that needs a head installed under, numerous heads are blocked by ductwork in mechanical room. Provide fire sprinkler protection under stairs per 8.15.3.2 of the 2016 NFPA13.

Verfiy that the sidewall heads in the "Quiet Room" meet the requirements of 8.7.4.1 of the 2016 NFPA 13 .

Contact Keith Orahood ###-#### 30 Min prior to RTC/Hydro Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro8/1/20198/2/20198/2/2019ACANC
DetailsJim Page
Contact Keith Orahood ###-#### 30 Min prior to RTC/Hydro start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
Sprinkler Plan Check6/11/2019 6/12/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  6/12/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  6/12/2019 DONE
met
Issue and Print Permit  6/12/2019 DONE
Application received  6/11/2019 DONE
Application submitted via PDS Online on Jun 11 2019 11:28AM
Intake Approval  6/11/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)6/11/2019 6/11/2019 DONE
DetailsMark Stumbaugh