INSP-Final Inspection | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Matt Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Payton Phone #: ###-####
|
Issue and Print Permit | | | 6/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/19/2019 | | DONE |
|
|
|
Met
|
Application received | | | 6/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 18 2019 3:38PM
|
Intake Approval | | | 6/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/18/2019 | | 6/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/18/2019 | | 6/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
|