INSP-Final Inspection | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piiping complete, approved for cover. Notated city approved drawings in two areas, one has a head that needs relocated to the next tile to cover shadow area and an area that has 2 heads less than 6 foot apart. Will verify corrections at final inspection.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Application received | | | 6/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2019 12:38PM
|
Intake Approval | | | 6/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/20/2019 | | 6/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/20/2019 | | 6/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/20/2019 | | DONE |
|
|
|
|