Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR19-00468
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 55 N ALLUMBAUGH ST
Project NameALLUMBAUGH SELF STORAGE
Customer Number 
ePlanReviewYes
Description
THIS IS A NEW 2-STORY SELF STORAGE BUILDING. THE 1ST FLOOR IS A DRY SYSTEM AND THE SECOND FLOOR IS A WET SYSTEM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/25/20203/25/20203/25/2020PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection3/24/20203/24/20203/24/2020PFAIL
DetailsTroy Cobbley
Need overhead and underground test papers.

RICK FRY IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro3/2/20203/3/20203/3/2020APASS
DetailsTroy Cobbley
24 air test passed.

rick is contact this is to complete our 24 hour air test Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro3/2/20203/2/20203/2/2020PDONE
DetailsTroy Cobbley
Started 24 hour air test at 9:00am with 65 psi on the guage.

RICK FRY IS OUR CONTACT. THIS WIL BE A 24 HOUR AIR TEST ON THE DRY SYSTEM Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro2/27/20202/28/20202/28/2020ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on levels 1 and 2 witnessed, no pressure loss observed.

ROY IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro1/22/20201/23/20201/23/2020APASS
DetailsTroy Cobbley
2nd floor rough in pass. Verify baffles are installed on 2nd floor.

RUDY IS OUR CONTACT.
THIS IS A ROUGH-IN FOR THE 2ND FLOOR Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in/Hydro1/20/20201/21/20201/21/2020APASS
DetailsTroy Cobbley
First floor rough in passed.


RUDY IS OUR CONTACT.
THIS IS A ROUGH-IN FOR THE 1ST FLOOR ONLY AT THIS TIME Phone #: ###-#### Inspection requested via web by Brad Bettencourt
Plan resubmittals received  7/3/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/3/2019 7/3/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  7/3/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  7/3/2019 DONE
Issue and Print Permit  7/3/2019 DONE
(F) Reprint permit  7/3/2019 DONE
(F) Reprint permit  7/3/2019 DONE
Sprinkler Plan Check6/24/2019 6/25/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  6/24/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)6/24/2019 6/24/2019 DONE
DetailsMark Stumbaugh
Application received  6/21/2019 DONE
Application submitted via PDS Online on Jun 21 2019 6:37AM