INSP-Final Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Contact is Chris Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover. Notated an area on the city approved draiwngs where there is exposed combustible material above the ceiling grid, will verify area is covered by sprinkler protection at final inspection.
Zack is The contact Phone #: ###-#### Inspection requested via web by Chris Green
|
Issue and Print Permit | | | 6/25/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/24/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 6/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/24/2019 | | 6/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/24/2019 | | 6/24/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 6/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/24/2019 | | 6/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/24/2019 | | DONE |
|
|
|
|
Application received | | | 6/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 21 2019 10:42AM
|