INSP-Final Inspection | 9/3/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
INSP-Final Inspection | 8/27/2019 | 8/29/2019 | 8/29/2019 | A | CANC |
Jim Page
|
|
|
Dave Phone #: ###-#### Inspection cancelled from web by: david davis
|
Permit Ready to Issue | | | 8/27/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/27/2019 | | DONE |
|
|
|
plan mod for micron
|
Plan Modification Accepted | | | 8/22/2019 | | DONE |
|
|
|
|
1st review completed | | | 8/22/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/22/2019 | | 8/22/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/22/2019 | | DONE |
|
|
|
On site plan mod review. Fee is $150 for review.
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
per Lee M-plan review done in field-passed
|
Issue and Print Permit | | | 6/28/2019 | | DONE |
|
|
|
|
1st review completed | | | 6/27/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 6/27/2019 | | 6/27/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/27/2019 | | DONE |
|
|
|
On site review passed.
|
Application received | | | 6/21/2019 | | DONE |
Lee G Meredith
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 6/21/2019 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|