INSP-Final Inspection | 8/20/2019 | 8/21/2019 | 8/20/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for area of work complete, notated city approved drawings areas approved for cover.
Mike Phone #: ###-####
|
PLANS TAKEN FRONT DESK ALARM | | | 6/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 6/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/28/2019 | | 6/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/28/2019 | | 6/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 6/28/2019 | | DONE |
|
|
|
|
Application received | | | 6/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2019 4:20PM
|